logo
News
Home > news > Company news about Strict requirements must be met before working on trough cable trays
Events
CONTACT US
Contact Now

Strict requirements must be met before working on trough cable trays

2025-07-16

Latest company news about Strict requirements must be met before working on trough cable trays

Before the construction of trough cable trays, strict requirements must be strictly followed to ensure project quality and long-term stability.
The bridge frame, connectors, and accessories must comply with the current national technical standards, and the anti-corrosion type and specifications must be consistent with the design requirements. The thickness and structural strength of the board must meet the load requirements. It is necessary to draw a routing diagram in advance, indicating the coordinates and elevations of the starting point, turning point, branch point, to ensure that the path is free of interference. Fill rate of 50%, width>0.1 meters to ensure ventilation, heat dissipation, and cable layout space. Measure the preset path, remove obstacles, estimate the load, and develop a construction plan. When entering indoors from outdoors, the slope is 21/100. Installation height of 22.2 meters, top distance from obstacles ≥ 0.3 meters, parallel laying time distance ≥ 0.6 meters. The verticality deviation of the bracket is 1.5mm/m, the levelness deviation is 3mm/m, and the straightness deviation of the entire length is ≤ 5mm. Supporting connectors are required for turning, tees, and other nodes, with bolt torque greater than 25N. m and complete anti loosening parts. The spacing between brackets should be 1.5-3.0 meters horizontally and ≤ 2.0 meters vertically, and the length should comply with the specifications to avoid deformation. Each bracket is firmly fixed, fixed every 2 meters when the cable is tilted>45 °, and fixed every 5-10 meters when laid horizontally. Sealing materials with a fire resistance of 21 hours are used at the crossing of the fire compartment. When the total length of the metal bridge is 30 meters, there should be at least 2 grounding points. For long-distance bridges, grounding should be done every 30-50 meters to ensure reliable bridging. Construction personnel must hold certificates and work strictly according to the drawings and standards. Welding and fastening parts require special inspections. After installation, clear markings should be sprayed and rows of cable trays should be neat and uniform. Load testing and ground connectivity testing are inspection items.
The strict requirements before the construction of cable trays in trough type include material compliance, precise design, process control, and protection, which need to be implemented in combination with specifications and on-site measured data. Any oversight may lead to structural failure or hidden dangers, therefore full supervision and retention of acceptance records are required throughout the process.

 

槽式电缆桥架

Send your inquiry directly to us

Privacy Policy China Good Quality Galvanized Cable Tray Supplier. Copyright © 2025 Hebei Kangming Metal Products Co., Ltd . All Rights Reserved.